Feb 2013

The car that wanted to share the bikepath

As you night know I bike to work along the Schuykill River bike path, that is shared with walkers. On Thursday a car wanted to share the path as well, unfortunately it was a little too wide to get under the Chestnut street bridge.Car on bike path
Car on bike path (1)

Car on bike path (2)

New Floor

The south facing old kitchen floor
New floor

The mysterious “trap door”
Bike Ride January (1)


Joists all repaired and leveled
Bike Ride January (2)


3/16 plywood covering to match height of new wood to old wood
Bike Ride January (3)

Ready for “David R. Hardwood Co” to come in.
Bike Ride January (4)

After first day (Wednesday evening)
New floor Cleo

Final product (Saturday morning, 9 Feb.)
Bike Ride January (6)

Here is the upstairs
Bike Ride January (7)

Floor joist repair

The floor joists needed a bit of work and we did not need the old trap door opening. So Roland put away his fine wood crafting tools and applied some heavy lumber, ensuring at the same time the floor level was all within 1/16 th of an inch!

Floor Joists

We even put the “mystery brick towers” to use to support the floor from underneath. Floor Joists (1)



Floor Joists (3)