New Floor

The south facing old kitchen floor
New floor

The mysterious “trap door”
Bike Ride January (1)


Joists all repaired and leveled
Bike Ride January (2)


3/16 plywood covering to match height of new wood to old wood
Bike Ride January (3)

Ready for “David R. Hardwood Co” to come in.
Bike Ride January (4)

After first day (Wednesday evening)
New floor Cleo

Final product (Saturday morning, 9 Feb.)
Bike Ride January (6)

Here is the upstairs
Bike Ride January (7)